Laserfiche WebLink
a.,. ~ _. <br />z <br />3. Permit conditions shall be protective of the existing ar~d reasonably <br />potential future uses of the ground water that may be ai`fected. The <br />Water Quality control Commission's ground water quality table values <br />shall be used as a guide in establishing the permit conditions. <br />4. Where ambient ground water quality exceeds values for protection of <br />existing and reasonable potential future uses of ground water, <br />permit conditions shall be established to protect those uses against <br />further lowering of ground water quality. <br />In promulgating a rule that requires establishment of permit conditions <br />protective of ground water, the Mined Land Reclamation Board made it clear <br />that requirements should not be imposed that would require remediation of <br />substances already in the ground water on the effective date of the permit <br />conditions, unless such additional requirements are necessary to comply <br />with standards or classifications adopted by the Water quality Control <br />Commission. The Board also made it clear that if ambient ground water <br />contaminant levels are elevated above guidance levels e.uitable for <br />protecting ground water uses, these elevated levels would likely become <br />the criteria to be met at points of compliance. It is likely that permit <br />conditions which are predicated on elevated ambient concentrations will <br />include an ambient monitoring requirement. <br />Points of Compliance: <br />1. At operations where the potential to affect ground wafter quality <br />exists, one or more points of compliance shall be •~stablished. <br />Points of compliance are established in order to: <br />evaluate protection afforded ground water quality, <br />o comply with ground water standards; <br />demonstrate compliance with permit conditions. <br />2. On a schedule approved by the DMG, an operator shall comply with <br />ground water quality standards established by the Water Quality <br />Control Commission at points of compliance. Where the Water quality <br />Control Commission has not established standards, then permit <br />conditions established by DMG or the Mined Land Reclamation Board <br />shall be met at points of compliance, or as specie°ied in the <br />approved permit. <br />3. For existing facilities, where ground water quality st~indards have <br />been established, the points of compliance shall be established at <br />some distance down-gradient from the source, and at t:he distance <br />closest to the source considering technical feasibility, as follows: <br />the down-gradient limit of contamination; <br />the permit boundary; <br />