Laserfiche WebLink
r <br />COLO8AD0 DIVISION OF MINERALS AND CBOLOC- <br />DOZBB COST 1 PBBFORXANC6 DATA NORBSHBBT <br />Machine Make 1 Nodal: Cat D8N <br />Dover Blade: Seai-Universal <br />Attachment il: BOPS Cab <br />Attachaent i2: 3-shank ripper <br />Last Coat Revision. Nag, 1992 <br />............... <br />BA9B BAUIPNBNT COSTS ICRC) <br />------------ Base Ownership A Overhaul Costs -------- -----;------- -------- Base Operating Coats ------- -------- <br /> Ownership Overha ul Field Repair ; <br />Depreciation CFC Overhead Labor Parts; Labor Parts Fuel Lube Tires C.B.C. <br />Machine : (20.76 36.19 !5.40 f4.22 J9.37 !4.69 fi.56 !9.17 !2.77 !0.00 !1,26 <br />Attachaent it !0.00 !0.00 !0.00 !0.00 !0.00 !0.00 !0.00 !0.00 10.00 f0.00 !0.00 <br />Attachaent i2 : 42.84 !0.74 !0.69 !0.70 41.00 !1.29 10.85 !0.00 !0.22 40.00 !0,71 <br />R8FB86NCRS: 1) Coet Beferemce Cuide IDRD) <br />2) Contractors Nquipmemt Cost Cuide ICBDC) <br />3) Colorado Cootractors Association <br />Mage Bate Schedule <br />41 Caterpillar Performance Handbook <br />sheet 1 of 2 sheets <br />C09T ADJUSTMENT FACTORS ICBCC) <br />Factor Description <br />------------------------ <br />Acquisition coat: <br />Bcon. life hrs.-machine: <br />-Btteeb~ il: <br />-attach. i2: <br />Annual use hours: <br />Mechanic's labor coat: <br />Fuel cost/gal.-gasoline: <br />-diesel: <br />Luba cost: <br />Tire life hours: <br />Tire factor: <br />Tire coat: <br />f237,239.06 <br />10,455 <br />8,800 <br />8,200 <br />1,525 <br />(21.95 <br />41.12 <br />40.87 <br />32.77 <br />0 <br />D <br />40.00 <br />0.806 <br />0.999 <br />1,000 <br />1,000 <br />1.385 <br />0.886 <br />1,000 <br />l.DOo <br />1.000 <br />1,000 <br />1.000 <br />1,000 <br />Base Value Adj. Value Multiplier <br />--------------- <br />l294,460.00 <br />10,445 <br />8,800 <br />8,200 <br />2,112 <br />!24.78 <br />41.12 <br />40.87 <br />42.77 <br />0 <br />0 <br />40.00 <br />ADJUSTED RAUIPNRNT COSTS <br />ACQUISITION COST BRBABDONN <br />Cost Elements ICRCD) Factor <br />Hasa purchase price <br />Lase dealer discount <br />Plus freight <br />Plus dealer chargesi <br />iNLBD estimate <br />Adjusted purchase price <br />Plus tares: Sales 0 OX <br />SXN B2x <br />Less tits coat <br />Less salvage value <br />Net acquisition cost <br /> ----- ----- Adjusted Ownership d Overhaul Costs ----- ------;- ------ <br />Acquisition cost !19.01 N/A N/A N/A N/A N/A <br />Econ.life -Doser d ROPS (19.00 N/A N/A 44.22 49.36 44.69 <br />-Attach. i2 N/A N/A NIA 40.70 !1.00 91.29 <br />Annual usage f2b.33 19.60 48.43 NIA N/A N/A <br />Double shifts (19.75 44.80 !4.22 N/A NIA N/A <br />Triple shifts !17.56 43.20 42.81 NIA NIA NIA <br />Xech.labor-Dover l ROP9 NIA N/A N/A 33.74 N/A 54.15 <br />-Attach. i2 NIA N/A NIA 40.62 NIA 41.14 <br />Puel/lobe -Doser d BOPS N/A N/A N/A NIA NIA NIA <br />-Attach• i2 N/A N/A N/A N/A N/A N/A <br />f237,239.Ofi <br />Adjusted Operating Casts <br />N/A N/A N/A N/A N/A <br />fT.55 N/A N/A NIA NIA <br />f0.85 NIA N/A N/A N/A <br />N/A NIA N/A N/A N/A <br />NIA N/A N/A N/A N/A <br />N/A N/A N/A N/A N/A <br />N7A N(A NIA NiA N(A <br />N/A N/A N/A N/A NIA <br />N/A 49.17 42.77 40.00 11,26 <br />N/A 40.00 40.22 40.00 40.71 <br />o.lDo <br />0.020 <br />0,005 <br />Adj. Coat <br />3294,460.00 <br />!29,446.00 <br />!5,889.20 <br />ft,472.30 <br />5272,375.50 <br />(8,171.27 <br />!5,447.51 <br />!0.00 <br />0.179 !48,755.21 <br />