Laserfiche WebLink
<br /> <br />8oadable equipaent: sheet 2 of 2 <br />"" " "" " """ Total Bqp. Fleet Siee Haul Trip Return Trip <br />Xachine Description Costlhr (no. hauled( Cost/hr Costlhr <br />Subtotals <br />BOBIDBNOB SUPPORT BBUIPNBNT: " "" "' "" " "' <br />" """ """ " "" " ""' Height Oxnership Naul Rig Fleet Site Haul Trip Return Trip DOT Perait <br />Non-8oadable 8qp. Description (tons Cost/hr Cost/hr (no. hauled( Costlhr Cost/hr Coet/ea <br />Subtotals <br />......... ......... ......... <br />Total Bqp. Fleet Siee Nau! Trip 8eturn Trip <br />Boada6le Bqp. Description Cost/hr (no. hauled( Costlhr Coet/hr <br />Subtotals <br />......... ......... <br />BAUIPNBNT HAUL DISTANCE d TINE <br />------------------------------ <br />Neareat aajor city or town within project area region: Colorado Springs <br />........................................................ <br />Total one xay travel distance = 10.0 <br />...... Hiles, Average travel speed = <br />.... 10.00 <br />......... aph. <br />Job Tiae - Non 8oadable 8quip.c 1,00 hours load 8oadable Bquip.= N/A haute load <br />1.00 houce haul 1.00 hours haul <br />1.00 hours unload N/A hours unload <br />1,00 <br />------- houce <br />------ return <br />-------- 1.00 <br />-------- hours <br />------ return <br />------ <br />:OB COST Total Moh <br />--------- <br />--------- /Deao6 Cost = 52,881.96 <br />------------- <br />------------- <br />NOTE: Non-roadable equipaent (haul rig required to transports sob/deuob costa based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-way eopty return. 8oadable equipaent (no haul rig required( <br />costa based on one round trip, Colorado DOT requites special peraits for oversiee equipaent on certain <br />specified toad segaents within the State, Separate peraite are required for each rig on each loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversieel are also required for oversise <br />equipaent hauling, and loading/unloading tines Duet be increased substantially for equipuent which oust be <br />partially disaaotled fat transport and re-asseabled at the job site. Costa for lifting equipuent and other <br />support equipaent needed for this work should be included in the aob/deso6 costs. <br />