Laserfiche WebLink
<br />based on the lower- to midrange quote from four fence contractors. A $59 estimate was received from Standard <br />Fence of Denver, a $45 estimate was received from Elcar Fence of Denver, a $30 estimate was received from Split <br />Rail Fence of Denver, and a low bid of $26 was received fmm Green Mountain Ornamental Iron in Lakewood. <br />(4) Assume 8 hours plowing with small tractor at $80 per hour including labor, consumables, and mobilization. <br />(5 Assume 6 inches of topsoil over 1/3 acre or approximately 270 cubic yards of topsoil. Topsoil to be hauled to <br />the site from Carbondale, 35 miles away. Quotes were solicited from a number of haulage contractors. The average <br />was $25 per yard delivered to the site all inclusive. <br />(6) Assume 8 hours spreading with a small loader/spreader at $80 per hour including labor, consumables, and <br />mobilization. <br />(7) Assume 3 hours seed drilling at $60 per hour and 1400 pounds of mulch applied at a rate of $500 per acre <br />including labor, consumables, and mobilization. <br />(8) Assume 60 tree seedlings in 4 groupings at a rate of $15 per tree and 50 shrubs seedlings at a rate of $15 per <br />shrub including labor, consumables, and mobilization. <br />(9) Assume two crazy-ass eXtr'eme rods chAibers two days at $40 per hour for removal of cables and curtains. <br />Assume 6 days for two workers to remove temporary fencing and drainage pipe (if not buried) at $40 per hour. <br />(10) Assume 6 days for two workers to improve foot trail at $40 per hour. <br />Maximum disturbance of the land is anticipated at the end of the mine life when the <br />marble waste piles have reached their maximum size. However, the amount of land to be <br />revegetated is limited to a portion of the access roads on the surface of the waste piles. The total <br />azea to be revegetated should not exceed 1/3 acre, even at the time of maximum disturbance. <br />No building demolition will be required. Existing equipment, such as the fuel tank <br />and generator trailer will have sufficient scrap value to easily cover the cost of removal should <br />Sierra fail to do so upon completion of mining. <br />28 <br />