Laserfiche WebLink
EXHIBIT L <br />EST/MATED UN/~~STS fOR RECLAMAT/ON ITEMS: <br />RECLAMATION COSTS (coot) <br /> unit Cost <br />1. Revegetation includes grass seed mix, mulch, <br /> fertilizer and labor to drill $500.00 /ac <br />2. Re-spreading soil and/or growth media with <br /> 6316, haul distance 500 ft or less 0.405 /YD3 1/ <br />3. Sloping using cut/fill method on working face <br /> D-8 cat, push distance 125 ft or less 0.208 /YD3 1/ <br />4. Grading seed bed and shaping resoiled areas <br /> 140-G Motor grader, ~ 1.23 ac/ hour 49.24 /ac ?~ <br />RECLAMAT/ON COSTS <br />1. Revegetation, 18.12 ac @ $500.00/ac $9,060.00 <br />2. Resoilinq, haul distance less than 500 ft., <br /> (12,237 yd3 x 1.12 swell) @ $0.405/yd3 5,545.01 <br />3. Working face sloping using cut/fill method <br /> 48,000 yd3 @ $0.208/yd3 9,976.26 <br />4. Grading and shaping seed bed. <br /> 18.12 acres @ $49.24 /ac 747.03 <br />5. Reseeding costs 9.06 ac @ $250.00/ac 807.50 <br /> Net Tota/ $ 26,135.80 <br />6. Indirect costs <br /> Mobilization round trip (haul 2 miles one way) 2,368.29 <br /> Insurance, Bond, & Profit 3,423.80 <br />9. Administration costs 2 850.41 <br />TOTAL ESTIMATE 34,778.30 <br />RECOMMEND BOND BE SET AT 535,000.00 <br />1/ Figured using Cat Handbook and numbers used by Divi9 ion for wear elope sand and gravel mines <br />for B3i efficiency. <br />30 <br />