Laserfiche WebLink
The impoundments have the following estimated capacities: <br />IMPOUNDMENT CAPACITIES -ACRE FEET <br /> Water Sediment Total <br />Pond B 4.10 0.31 (50% 0.62) 4.41 <br />Pond C 3.47 0.46 (100%) 3.93 <br />Pond D 0.48 0.06 (66% 0.10) 0.54 <br />Pond J 1.32 1.16 (100%) 2.47 <br />Pond K 0.49 0.20 90% 0.22 0.69 <br />Notes: <br />1. The capacity of Ponds B and C are shown on Maps 22-B and 22-C respectively. <br />2. The capacity of Pond D was certified by the undersigned on 12-30-97. <br />3. The capacity of Ponds J and K were certified by the undersigned on May 29, <br />2002. <br />With the exception that Pond ~~;dl~ dewatered, to the best of my knowledge and <br />belief, the impoundments $ee~eet~v~~v°rx~'ned as designed and in accordance with <br />the approved plan and ap ~ o~hleSregula;~,~a, <br />• arR F`~ • <br />~.~ames E. Stov~rs• Date <br />9230 <br />