Laserfiche WebLink
QUARTERLY POND INSPECTION REPORT <br />Mine <br />Pond Identification <br />~ Type of Pond <br />Status During Inspection: <br />Approximate Water Level <br />Sediment (% total storage) <br />Outflow (cfs) <br />Erosional <br />Rills & Gulleys <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />Structural <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />purtenant Structures <br />Defective Spillways <br />Dewatering Devices Clogged <br />Faulty Gates, Etc, <br />Other <br />Comments <br />Required: <br />oflnspector: Jim Stover <br />Bowie Resources Limited Quarter: <br />Bowie No. 2 Mine - C-96-083 Inspection <br />B C D -Gob Pile J UTL East K UTL West <br />Sediment Sediment Sediment Sediment Sediment <br />I No I No I No I No I No II <br />No No No No No <br />No No No No No <br />No I No <br />No <br />No I No I No I No I <br />The water in Pond C was above the level of the primary spillway. <br />The water level in Pond B was at the elevation of the primary spillway. <br />There is some sediment accumulation on the west end of Pond B. <br />Pond J & K lack good vegetative cover, Pond B vegetation is fair. <br />.. ~ ~•.,,,c. <br />E~,~~O ~ulP®~ <br />ot,_ P <br />Dewater Pond C. • 00 ~ ~ F ~S j`~~'A~®' <br />` °~ 17.30 "~" <br />~*. o ~ <br />~ o <br />O C <br />~.O ~ n 4 <br />•~` ~=.E. Stover _o _.~ 0 <br />Date <br />