Laserfiche WebLink
merely constructed on top of the area with no major disturbance to the <br />• subsurface that might be found in the area. Details of the topsoil <br />handling plan are set forth in Section 2.05.3. <br />No overburden materials will be substituted for topsoil, nor will <br />topsoil be supplemented with such materials. All existing areas within <br />the facilities area of the permit area, requiring topsoil removal, have <br />adequate topsoil to comply with reclamation requirements. <br />Additional information concerning the soils found within the permit area <br />is included in Exhibit 9, Soils Information. <br />• <br />C~ <br />2.04-42 <br />