Laserfiche WebLink
<br />CYCC - Certification Inspection <br />Page Two <br />Inspection Date - August 15, 1988 <br /> <br />2) A section on the east edge of upper channel has high <br />fines percentage. This makes it difficult to assess <br />gradation and competency of underlying matrix. <br />CORRECTIVE MEASURES NOTED <br />o Provide intermediate fill for west bank section. <br />o Remove fines from surface on east bank section and if <br />necessary excavate any excess fine material and replace with <br />well graded riprap. <br />o Work to maintain uniform gradation. <br />