Laserfiche WebLink
=.t ~ ACZ ine. • i <br />~y~ ~ Eng,neering and Analytical Services <br />, ia75 Pine Grove Road <br />PO. Box 77a01a <br />S~eamboat Spnngs. Coloraao 80477 <br />303 8796260 <br />January 9, 1989 <br />Mr. Rick Mills <br />Colorado Yampa Coal Company <br />24587 Routt County Road 27 <br />Oak Creek, Colorado 80467 <br />Re: Certification and Inspection Work for Drainage Channels <br />Dear Rick: <br />Per our telephone conversation today, I am enclosing with this letter <br />ten (10) field inspection reports prepared by ACZ and seven (7) <br />material testing reports prepared by Ground Engineering Consultants, <br />Inc. (GEC) relative to your recently completed drainage construction <br />project. <br />Included with this letter are ACZ field inspection reports dated: <br />1) July 15, 1988 6) August 29, 1988 <br />2) July 29, 1988 7) September 1, 1988 <br />3) August 15, 1988 8) September 9, 1988 <br />4) August 17, 1988 9) September 22, 1988 <br />5) August 22, 1988 10) September 30, 1488 <br />In addition, I have included GEC material testing reports dated: <br />1) June 23, 1988 <br />2) Ju]y 27, 1988 <br />3) August 1, 1988 <br />4) August 3, 1988 <br />5) August 31, 1988 <br />6) September 12, 1988 <br />7) September 27, 1988 <br />I believe this fulfills the requirements outlined in the CMLRD letter <br />of December 22, 1988. If you have any questions or need further <br />assistance, please do not hesitate to contact me. <br />Very truly yours, <br />ACZ INC. <br />~,u~ P <br />Conrad H. Parrish <br />CHP:rce <br />enclosure <br />