Laserfiche WebLink
• <br />o Bedding and riprap have been extended an additional 100' in <br />Drainage 31-1. The same comments as noted for Drainage 31-2 <br />are applicable for the completed section. <br />o Bedding and riprap placement have been completed for all <br />except the upper 150' of Drainage 7, Bedding and riprap <br />placement look good, with adequate thickness, uniform <br />. placement and good gradation. The final section will be <br />..__._ .- completed as soon as more rock can be hauled in. <br />CORRECTIVE MEASURES NOTED <br />o Excessive large rock in flow path on Drainages 31-1 and 31-2 <br />needs to be removed and the channel configuration more clearly <br />defined. Future riprap placement in Drainage 31-1 should <br />emphasize maintenance of the design channel configuration. <br />