Laserfiche WebLink
• Section 827.12 <br />(e) Permanent impoundments associated with coal processing plants shall <br />meet the requirements of 30 CFR 816.49 and 816.56. Dams constructed of <br />or impounding coal processing waste shall comply with 30 CFR 816.91-616.93. <br />No permanent impoundments are planned at the Kerr Tipple Site. <br />Kerr Coal does not generate coal processing waste at [he Kerr <br />Tipple, therefore, no dams will be constructed to impound coal <br />processing waste. <br />(f) Use of water wells shall comply with 30 CFR 816.53 and water rights <br />shall be protected in accordance with 30 CFR 816.54. <br />• A complete discussion of water wells, water rights and their pro- <br />tection is presented under Sections 816.53-816.54. <br />(g) Disposal of. coal processing waste, solid waste, and any excavated <br />materials shall comply with 30 CFR 816.81-816.33, 816.89, and 816.71- <br />816.74, respectively. <br />As stated throughout this application, Kerr Coal will generate no <br />coal processing waste, and will not excavate material at the Kerr <br />Tipple site. <br />(h) Discharge structures for diversions and sediment control structures <br />shall comply with 30 CFR 816.47. <br />n <br />U <br />827-3 <br />