Laserfiche WebLink
• Section 827.12(b) Continued. <br />A complete discussion on maintenance and reclamation of roads, <br />transport and associated structures at the Kerr Tipple Area can he <br />Found under Sections 780.12, 780.37, and 816.150-816.181. <br />As stated throughout this application, no new roads, transport and <br />associated structures will he constructed or modified. <br />(c) Any stream or channel realignment shall comply with 30 CFR 816.44. <br />No stream or channel realignments are planned at the Kerr Tipple <br />Area. <br />• (d) If required by the regulatory authority, any disturbed area related <br />to the coal processing plant or associated Facilities shall have sedi- <br />ment control structures, in compliance with 30 CFR 816.45 and 816.46, <br />and all discharges from these areas shall meet the requirements of 30 <br />CFR 816.41-816.42 and any other applicable State of Federal law. <br />The Kerr Tipple facility is equipped with adequate sediment control <br />structures which comply with 30 CFR 816.45 and 816.46, to assure <br />[hat discharges from the area meet the requirements of 30 CFR <br />816.41-816.42, and applicable State and Federal laws. <br />A complete description of the Kerr Tipple Area sediment control <br />facilities is found in Sections 780.21 and 816.41-816.49. Refer <br />also to Exhibit 30, Kerr Tipple Area Drainage and Sediment Control <br />Plan. <br /> <br />827-2 <br />