Laserfiche WebLink
-z- <br />II. Reclamation of the terraces will begin in seven years and <br />will continue until the end of the operation. <br />III. The Reclamation of the 123 foot high visibility are~~ will <br />begin the 7 years and will be completed within 10 to 12 <br />years. <br />c. Slopes - will vary from a nearly flat pit bottom to nearly <br />vertical faces on the terraces. <br />d. Topsoiling <br />I. Two feet of crushed limestone will be placed over the <br />terraces. <br />1I. One foot of crushed limestone will be placed over the berms. <br />III. Two inches topsoil and one foot of crushed limestone will <br />be placed over the sight reclamation. <br />IV. Soil amendments will be 40 lbs/acre nitrogen 80 lbs/acre <br />ohosbhorous 80 lbs/acre potassium. <br />e. Revegetation - <br />I. Seeding - Seed species to be used in mixture. <br />Pubescent lJheatgrass, Indian Ricegrass, Western. Wheat- <br />grass, Sideoats Grama, Little Bluestem, Mtn. Muhly, 4rizona <br />Fescue, Cicer Milkvetch, Blue Grama. <br />II. No irrigation will be used at site. <br />III. Woody vegetation - species. <br />Skunkbrush, Mtn. Mahogeny, Oakbrush. <br />d. Reclamation will be completed in the year 2060 (anproxima:e). <br />