Laserfiche WebLink
<br /> <br /> <br />1 <br />1 <br /> <br />1 <br />1 <br /> <br /> <br /> <br /> <br /> <br />1 <br /> <br />1 <br /> <br /> <br /> <br />Section III <br />'`PROJECT: <br />4RGANIZTIO~I <br />AND 1VIANAGEMEN'I <br />PROJECT ORGANIZATION <br />The personnel assigned to this project <br />possess considerable experience in <br />coordination and implementation of site <br />assessments, construction management, <br />remediation, and in the technical disciplines <br />of geology, hydrology, engineering, and soil <br />science. The experience and qualifications <br />of this staff in project management, field <br />analysis, data review, and remediation <br />evaluation provide the capability necessary to <br />perform the site well installation, <br />groundwater monitoring, and sampling, and <br />evaluation. <br />Project management and organization aze <br />key to the successful completion of projects. <br />Greystone will assure that a specified <br />technical scope of work is followed in a <br />timely and cost effective manner. Selection <br />of lead personnel is based upon previous <br />experience relevant to the project require- <br />ments and technical expertise in a particulaz <br />discipline. In addition, the team that has <br />been assembled for this project has effec- <br />tively worked together on several similaz <br />projects. <br />In order to best satisfy our clients needs, <br />Greystone cultivates open communication <br />between project team members. This <br />communication involves all levels on the <br />team from staff level to project manager, and <br />results in a level of service which ensures <br />technically sound and cost effective services. <br />All personnel aze subject to approval of <br />Costilla County. The qualifications of key <br />project personnel aze presented in this <br />section with detailed resumes included as an <br />appendix to this proposal (Appendu ?~. <br />cmunaV-9a <br />3-1 <br />