Laserfiche WebLink
Construction Report -West Taylor Pond <br />The West Taylor Reservoir was regularly inspected throughout construction. It is <br />hereby certified upon completion of construction as shown on the attached As-built <br />drawing in accordance with the approved plan and applicable regulations. <br />``~~~~°Pp0 l I CF~iiq <br />oQ~ ,........ 'L <br />~~ ~•S'C.Pfl•~J' <br />O lay f'P,st O <br />;'- 32257 = <br />z <br />P '. /J~Z/~o71 ~w <br />Attachments accompanying this report include: <br />• As-built drawing dated October 20, 2007 <br />• Photographs Taken During Construction, pages P-1 through P-11 <br />• Attachment A-1 Plasticity Chart (1 page) <br />• Attachment A-2 NWCC Lab Testing with Proctor Results (4 pages) <br />• Attachment A-3 NWCC Compaction Test Results (8 pages} <br />Page 5 <br />