Laserfiche WebLink
Construction Report -West Taylor Pond <br />The downstream flume was installed in early October. Because of delivery problems, a <br />substitution from a 24 inch flume to a 9 inch (throat width) was made. A `half pipe" open <br />culvert will need to be installed to direct flows into the completed flume. <br />A final field survey was conducted by Peter Epp & Associates on October 18, 2007. <br />This data was used to produce the final as-built drawing and to calculate the storage <br />volume. Final storage volume of 5.52 acre-feet based on this survey compared well <br />with the design storage capacity of 5.64 acre-feet. <br />The embankment will be broadcast seeded with the approved seed mixture at the <br />specified seeding rate. <br />Page 4 <br />