Laserfiche WebLink
05045 <br />Exhibit L -Reclamation Costs <br />TABLE L-1: Reclamation Cost Estimate <br />Banks and Gesso, LLC <br />Item Quantity Unit Cost Total <br />Replacement of topsoil 26,685 yd3 $0.85/yd3 $22,682 <br />Backfill slopes to 3H:1 V 150,266 yd3 $0.85/yd3 $127,726 <br />Seeding and mulching 33.63 ac. $675 /acre $22,700 <br />Removal of portable screening plant, portable <br />office trailer, and 1000-gallon diesel fuel tank Lump sum $5,000 <br />Direct Cost $178,108 <br />Mobilization/Demobilization (8%) $14,249 <br />Overhead (18.5%) $32,950 <br />Administration (5%) $8,905 <br />Total Proposed Financial Warranty $234,212 <br />Note: reclamation costs are calculated using aworst-case scenario of 33.63 acres of <br />disturbed area with no concurrent reclamation. <br />Oglebay Norton Industrial Sands. Inc. February 2, 2006 <br />Jemadgin Sand Mine Page 20 <br />