Laserfiche WebLink
<br />CIRCES Cost EslimatinD Software <br />BULLDOZER WORN <br /> Agency or organization name .OMG <br /> <br />Task p : 01a State :Colorado PennitlablF : M-1000.049 <br />Date : 06288000 County :Montrose Ahbrevialion :none <br />User : SSS Site :Angle PIr Filename : M049-01a <br /> <br />Perm it or other job action :New 112c Application <br /> <br /> Task description :Strip topsoil off crest o/Phase II highwall to allow cu! and fll reduction <br /> <br />HOURLY E QUIPMENT COST Basic machine : Cat D8N (1996) Horsepower : 285 <br /> 81ade type : Semi-Universal <br /> AHachment no. 1 : ROPS Cab Shill basis : 1 per day <br /> AHachment no. 2 : 3-shank ripper <br /> <br /> Utilization Yu Cosl data source : (CRG) <br /> Cost Breakdown : Ovmership cosVhour : E41.10 NA <br /> Operating cosVhour: $55.64 700 <br /> Ripper op. cosUhour: $1.39 20 <br /> Operator cosVhour: $23.12 NA <br /> Total unit cosUhour : $121.25 Total gee) casl/hcur : (121.25 <br /> <br />Initial Swell <br />volume: 4,840 LCY lactor: NA <br />Source of quantity take-oH: Assume 3 acres covered with f loot <br />Source o(est. swell lactor : NA <br />HOURLY PRODUCTION <br />J9b Condition Correc <br />Average push distance: 65 lest <br />Unadjusted hourly production : 1034 LCYlhr <br />Material consistenq description <br />Partly consolidated stockpile <br />Average push gradient : 0.00 % (pas) <br />Average Bile altitude : 6,570 feet <br />Material weigh) : 2,800 Ibs/LCY <br />Material weight description <br />C/av-Natural bed <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.267 ILLY <br />Loose <br />volume: 4,640 LCY <br />Source <br />Operator skill: 0.75 (avg <br />Malarial consistency : 1.70 (Cat h <br />Dozing method: f.00 (gen <br />Ysibility: 1.00 (avg <br />Job eRciency : 0.83 ryshiN~ <br />Spoil pile : O.BO (Ind. <br />Push gradient : 1.00 (Cat { <br />Altitude: 1.00 (Call <br />Material weight : 0.82 (Caf f <br />Blade type : 1.00 (S or <br />Nel correction : 0.45 <br />Adjusted unit production : 465.15 LCV/hr <br />Adjusted beet production : 465.15 LCY/hr <br /> <br />Total job lime : 10.41 Hours <br />Total job cost : (1,262 <br />