Laserfiche WebLink
<br />(iii) An outline of the sequence in which each stage or phase of reclamation tivill be carried out: <br />a. Grade pit floor <br />b. Topsoil 4" - 8" -average 6" <br />c. Scarify if necessary <br />d. Fertilize <br />e. Drill seed <br />f. Mulch if required <br />(~ A description of each of the following: <br />The pit floor will be ]efr level with possibly a slight pitch to the south. There will be little to no <br />backsloping as the operation consists solely of removing the tops of some knolls. The only <br />backsloping will be on the north boundary south of St. Charles Road. <br />(i) Final grading <br />(ii) Seeding, types, mixtures, quantities and expected time of seeding: <br />Varie ecies ° ix L !A <br />sideoats grama Vaughn or Niner 50 4.5 <br />blue grama Covington or Hachita 30 0.9 <br />sand dropseed 10 0.1 <br />switchgrass Granville 10 0_5 <br />Total PLS/A 6.0 <br />This is a typical SCS recommended seed mix for Cascajo Series soils seeding in this azea. Seeding <br />is proposed for the Fall for best results in this azea. <br />(iii) Fertilization type, quantity and time of application. <br />SCS recommends 40#/A available N & P to be applied shortly before seeding. <br />(iv) Revegetation -types of trees, shrubs, etc. <br />None proposed. <br />F. _ ~i <br />