My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO20446
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO20446
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:46 PM
Creation date
11/20/2007 1:33:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984043
IBM Index Class Name
Hydrology
Doc Date
11/9/2006
Doc Name
Substitute Water Supply Plan
From
OSE
To
Deer and Ault Consultants, Inc.
Permit Index Doc Type
Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~o <br />~` Applegate <br />Group, ~~~. <br />October 30, 2006 <br />Don West, P.E. <br />State Engineer's Office <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />RE: Substitute Water Supply Plan for the Jesse Lee Pit M-84-043 <br />0 <br />~; <br />~g~ ~~ <br />a is ~ <br />~O~N ; <br />~ N ~ r <br />MO_.. $? <br />.ry~~ ~~ <br />$~.~pQo~ : Zy <br />Z~~h=~[$ <br />~~ ~2UU <br />0 <br />li~ ,'~:: ,des <br />NV~r l; ~ ~~q~r <br />,1 <br />W..' ... .~ :S <br />vr.. ..1 <br />Dear Mr. West: ' <br />The purpose of this letter is to request the approval of the Jesse Lee Pit Substitute Water Supply Plan <br />(SWSP) on behalf of Pelino Excavation, Inc. (Pelino). This renewal request is submitted pursuant to <br />C.R.S. 37-80-I20 (2), Attached with this letter is a check made payable to the Division of Water <br />Resources in the amount of $1,593.00. <br />PROJECT DESCRIPTION <br />The Jesse Lee Pit is located approximately 2 miles south of Buena Vista on the west bank of the <br />Arkansas River. The site is located in the SE '/a of Section 28 and the NE %a of Section 33, Township <br />14 South, Range 78 West, 6a' P.M. Maxwell Creek flows intermittently through the southwestern <br />portion of the property. Figure 1 showing the location of the Jesse Lee Pit is included for your <br />reference. <br />Pelino recently purchased the site and is working to bring the Jesse Lee Pit into compliance with <br />State and County agencies. The operation consists of sand and gravel production and will impact the <br />Arkansas River in the form of depletions due to evaporation and operational losses including water <br />used for dust' control and water retained in product hauled off site. <br />At this time, Pelino does not anticipate mining below the water table and therefore will not be <br />dewatering the site. Should the current mining plan change, an amendment to this SWSP will be <br />submitted'to your office. Mining at the Jesse Lee Pit site is projected to begin in January 2007 and <br />will continue for approximately 9 years. A 15 month tease from the Board of Water Works of <br />Pueblo (BWW) will be used for replacement water. <br />PROJECTED CONSUMPTIVE USE <br />Water use at the site during mining the operation will include evaporation from existing ponds and a <br />gravity fed drainage ditch, dust control of haul roads, and water retained in material removed from <br />the site. <br />1499 West 120th Avenue, Suite 200 (303) 452-6611 • Fax (303) 452-2759 <br />Denver, Colorado 80234-2759 www.applegategroup.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.