Laserfiche WebLink
0 0 <br />Mr. Mark Loye <br />April 8, 1983 <br />Page 6 <br />the first years mined area and so on. At the end of the mining unit 16 (the <br />topsoil from which was used to reclaim 15) and the haul roads will be <br />covered 7 to 9 inches deep with the topsoil from the topsoil berm placed during <br />the year. <br />2. Cost breakdown of reclamation costs <br />Topsoiling <br />Year 1 - remove and stockpile approximately 8.3 acre ft <br />of topsoil and place in berm approximately <br />40' x 1600' (1.5 acres) at $..80/yd. $10,713.00 <br />Year 2 - 4.5 acre-feet (in a lift 7 to 9 inches) at <br />$.80/yd. distributed over approximately 5 acres 5,916.00 <br />Grading <br />5 acres to be regraded at$60/hr for 30 hr. 1,800.00 <br />Drillseeding, mulching, and crimping <br />5 acres each year at $300.00 per acre. Includes weed <br />control if necessary. 1,500.00 <br />A recommended bond amount (worst year) <br />Total $14,013.00 <br />If you have any questions, please do not hesitate to call. <br />Sincerely, <br />RINDAHL & ASSOCIATES <br />Gilbe~ dahl, P.E. <br />President <br />GFR/ln <br />cc: Terra Construction, Inc. <br />