Laserfiche WebLink
~J <br />Mr. Gilbert F. Rindahl <br />-4- <br /> <br />November 4, 1983 <br />6. The fact that 6" of topsoil is to be placed directly over clay on <br />t the pit floor may cause problems with revegetating this site. Typically, <br />Y µ clay is not a good plant growth medium, and 6" of rooting depth and water <br />V holding capacity will probably not be sufficient for plant growth. I <br />K K~ therefore recommend that the operator leave at least 6" of product below <br />r,~:. the topsoil (and above the clay) to help to provide adequate plant growth <br />~o K° medium. <br />1. An examination of your proposed revegetation mixture (minus the rye <br />nurse crop) leads me to several question areas. <br />J a. Are the seeding rates given to be in pounds? <br />b. Is the seeding to be done by drilling or by broadcasting? If <br />J the seed is broadcast, it should also be raked in to assure that it <br />is properly covered. <br />c. The total seeding rate, if drilled, is nearly four times as <br />,r,~ high as the recommended critical area rate of 40 seeds/s q. ft. and <br />~ nearly twice as high, if broadcast. In fact, my calculations, <br />~ ~~ given your seeding rates, give a total of 145 seeds/s q, ft. Such a <br />,, rate will almost assuredly result in negative effects on some <br />1,' ~,~°~ species due to competition. The balance among the species may <br />b(~° accelerate such competition effects. By my calculations, the <br />percentages of your mixture for each species (on a seeds/s q. ft. <br />basis) are as follows: <br />Species Seeds/sq. ft. Percent of Mixture <br />Western Wheatgrass 32 22 <br />Sideoats Grama 16 11 <br />Needle-and-Thread 5 3 <br />Little Bluestem 21 14 <br />Prairie Sandreed 22 15 <br />Blue Grama 49 34 <br />Total 145 <br />Please reconsider the seeding rates of each species to give a more <br />practical total rate and a better species balance, or explain thoroughly <br />your reasons for proposing this mixture. The species composition of the <br />mixture seems appropriate, however. <br />8. How will the reclamation plan affect the ponds and the drainage way <br />V to the east of the operation? <br />Exhibit f <br />1. Given the fact that a pond, a well, and water usage issues are <br />outlined in this application, I have given a copy of this application to <br />the Division of Water Resources for their review. As soon as I receive <br />this review, I will forward a copy to you. <br />