Laserfiche WebLink
110 Pemic Aooliratlon lcont' • <br />INSTRUCTIO!.S: This application and all accampnnying materials must be suhmitted in <br />duplicate. In the ante rests or efficiant pro.:essin r„ ;.1.-asa i.;c lode <br />[hc follovia into r...a tic: .. ..--.,. Lir..'_td r c_ C-~___, .,_. ,_- PnLE <br />g _.pa ~_...__,...,., <br />3 for guidance; Special 10-day~Permlts, see RULE w for guidance.^^ <br />ESHIBIT A - Legal Description <br />The Legal description must identify the affected land and be wholly adequate For field <br />location of the property. It can be in [he fora of metes b bounds survey or a descrip- <br />tion by reference to township, range, and section, to at least the nearest quarter- <br />quarter section. Where applicable, the street address or lot number(s) my be used. <br />ERHIBIT B - Minin¢ Plan <br />This can be a general discussion of the methods, equipment, phases or stages of the <br />operation and those portions of land affected by each. The plan should be correlated <br />with the map and should shoe where extraction will begin, and which direction, if any, <br />it will proceed. <br />EXH LB IT C - `fap <br />This map should clearly define permit boundaries and indicate all roads or stockpile <br />areas to be used in connection with the operation. .111 imeaediately adjacent landowers <br />must be shown. The quarter section corner, section line, or any ocher locateable <br />points should also be show on this map. <br />EX^nIBIS D - Wildlife. Water Resources. Vegetation and Soils Information <br />Each of the above-mentioned subjects must be addressed as outlined in the applicable <br />RULE. <br />EZHIB IT E - Reclamation Plan <br />As with the mining plan, this should be a general discussion of the methods, equipment, <br />phases or stages of the reclamation process and those portions of land affected by each. <br />If possiSle, the plan should be closely correlated with the map. If not, the narrative <br />must be comprehensive enough tp draw as accurate verbal picture of the expected appear- <br />ance of the area after completion of reclamation. <br />'c!CdIBIT F - ProoF of Local Governmene Approval <br />This must be a Letter from the local government spec'_fying conformance with existing <br />zoning regulations. (I[ is intended that operators may obtain local government approval <br />concurrent with the Division's processing of the apolication. To do so, the operator <br />must submit evidence which indicates that local government approval is currently pending <br />or will at least be considered within a reasonably short time by the appropriate govern- <br />ing body RULE 1.1(10) (Consult this RULE for full details on this requirement.) <br />E!CHIBIT G - Source of Legal Right to Enter <br />This could be a cony of the lease, deed, abstract of title, or current tax receipt. <br />An acceptable alternative would be a statement acknowledged by a notary public that <br />the operator has the legal right to enter and mine. <br />EYFiIBIT H - Reclamation Costs <br />For a 110 permit, if the operator requests surety co be less than $2500, the ooeratormust <br />submit facts to support such a request. Otherwise, a surety of $2500 will automatically <br />be set. For all 111 permits, the surety shall be $2500 per acre. <br />E.CHIBTT I - Terms of Governmental Contracts <br />For Special 10-Day (111) Permits, the operator must submit a copy of the contract or <br />other proof that proves the necessity of a special 10-day permit. The operator must <br />also submit evidence of [he surety provided under Che governmental contract, if it vas <br />required. <br />NOTICE PROCEDURES <br />After the application is considered "filed" (pursuant to RULE 1.1(10) with the Mined <br />Land Reclamation Division, notice procedures outlined in RULES 3.2 and/or r.2 must be <br />followed. (Format for such notices will be included in the letter you receive from the <br />2fLR staff informing you of the completeness ("f Sling") of your application. <br />ADDITIONAL INFOR<fATION <br />This space can be referenced for further information of any of the items on [his form. <br />To the best of my knowledge, all the information presented in this application is true <br />and correct. / <br />BY ~ J , <br />TIr_:. ~,~, President <br />(Si s't.=a inJ :':•: ~u..l !•~, it l•: auChor_ <br />i..d to 'Sti~j C::e ep?rotor [o [his <br />-- •' ice.. _ _,.... ) <br />