Laserfiche WebLink
History Well P1-0 <br />• Sampling <br />• July 1999 water quality samples were collected from all three completions <br />using stainless steel bailer. <br />• August 1999 water quality samples collected from all three completions <br />using dedicated gas displacement pumps. <br />• September 1999 water quality samples collected from all three <br />completions using gas displacement pump. <br />October 1999 water quality samples collected from A Groove and B <br />Groove using dedicated gas displacement pumps. No sample collected <br />~{ from Dissolution Surface as a result of blockage m sampl~e~ Ime <br />_'IYotes ~';~`~~. ~~~. .`~~.~i.~'~`~`~.._, .)'R..:.~•~~=~~'.i<,.;~`~~"'r ;fir ~' ^~ <br />A Uinta Formation well was installed as the fourth completion in the 21-4 multiple <br />completion borehole, but when development work commenced it became <br />apparent that the screen interval had been lost to grout leakage, so the Uinta <br />completion was filled with grout and abandoned. A separate borehole was drilled <br />on the same location and completed as 21-4U. <br />n <br />LJ <br /> <br />