Laserfiche WebLink
Date Description <br />11/22/96 BLM approval letter on withdrawal of Right-of-Way. <br /> Letter fiom West Elk on proposal agreement. <br />11/26/96 Federal Mailing of approval of PR-03. <br />12/5/96 Signed agreement returned to West Elk. <br />12/6/96 Received quotation from Kissner Drilling. <br />12/9/96 30-day public comment period ends for PR-03. <br />12/10/96 Letter to West Elk on selection of Ground Water <br /> Development as drilling contractor. Posted permit id <br /> signs for PR-03 permit area. <br />12/12/96 Lined out Chuck Chesnik for site preparation. <br />12/16/96 Chuck Chesnik on-site to prepare access to drill site, <br /> cleared snow and lay down road base. <br />12/26/96 Drillers scheduled on-site at Noon, arrived on-site at <br /> 2:00 pm. Drillers set-up and Chesnik dug mud pits. <br />12/27/96 Received invoice from Ground Water Development for <br /> mobilization. Drillers arrived on-site at 1:00 pm, <br /> still on set-up, requested change in pipe <br /> specification. <br />12/30/96 Drilling started. Drill rig leaking oil. Mark Milner <br /> put out oil booms around the rig and in the mud pits. <br />1/2/97 Drillers proposed change in cement specification. <br />1/3/97 M.M. checked on drill site. No drillers on-site at <br /> 12:45 pm. <br />1/6/97 M.M. checked on drill site at 2:30 pm. Well was about <br /> 125 feet deep. <br />1/7/97 T.A. checked on drill site. No activity. <br />1/9/97 Chuck Chesnik dug the second mud pit. Well was about <br /> 265 feet deep. <br />1/10/97 M.M. checked on drill site at 2:25 pm. Well was about <br /> 320 feet deep. <br />1/13/97 Chuck Chesnik plowed the drill road again. M.M. <br /> checked on drill site. No activity on-site at 3:23 <br /> pm. <br />1/14/97 Rick Kuchler said he would be done with the well be <br /> Thursday. We11 was down about 405 feet. <br />1/23/97 Received invoice from Chesnik for snow-clearing and <br /> site-prep. <br />