Laserfiche WebLink
Date Description <br />7/29/96 Tour of West Elk drilling sites with Chesnik and met <br />with Beeman Drilling foreman and West Elk contract <br />geologist Kim Hood. <br />7/30/96 Received permission from Mike Dummond by fax. <br />8/1/96 Submitted response to DMG with proposal for wells. <br />8/12/96 Contacted Beeman Drilling for quotation, <br />8/13/96 Well permits issued by Division of Water Resources. <br />8/14/96 Carl Conner on-site for cultural resource survey of <br />well site. <br />9/1/96 Rock in coal seam at face in 3rd East Mains. <br />9/9/96 Submittal to DMG for Minor Revision Number 38 to drill <br />two water monitoring wells. <br />9/20/96 Submitted response to DMG on mud pits and sediment <br />control. DMG completeness letter on MR-38. DMG <br />proposed decision letter on MR-38. <br />9/30/96 Contacted Ground Water Development, Himes Drilling, <br />and Kissner Drilling for quotation and commitment on <br />completion of wells. <br />10/1/96 Request by DMG for extension on decision for PR-03. <br />10/2/96 Fax to Ground Water Development and Kissner Drilling <br />on well specifications. Federal Mailing of approval of <br />MR-38. <br />10/25/96 Formal withdrawal of Right-of-Way application. <br />10/31/96 DMG proposed decision letter on PR-03. <br />11/7/96 BLM approval letter on mine plan and R2P2. USFWS <br />approval letter. <br />11/8/96 BLM approval of 160-acre lease modification. <br />11/13/96 Letter to West Elk on proposal for coordinated effort <br />on wells. <br />11/14/96 Fax to L.A. Smith Drilling on well specifications and <br />request for quotation. <br />11/15/96 Received quotation from Ground Water Development. <br />11/18/96 Darrel Smith of L.A. Smith Drilling on-site. <br />11/19/96 Fax to Ground Water Development on site location and <br />copies of well permits. <br />11/20/96 Bill Carter of DMG on-site and inspected drill site. <br />11/21/96 Bill Kisner of Kisner Drilling on-site. <br />