sediment pond areas, the Hawken Pit dragline haulroad area and a former topsoil stockpile <br />location in Flintlock pit. <br />1.2.5 Cultural Practices <br />In addition to 2003 replaced topsoil revegetation practices, Trapper also conducted several <br />other cultural practices. These practices are addressed below. <br />Mature Shrub Transplant Clumps <br />In 2003, Trapper did not construct any new mature shrub clumps because of an early <br />November snow storm that precluded planned construction. Anew shrub clump is planned for <br />construction in the fall of 2004 in Flintlock Pit. <br />Drainage Reconstruction <br />Refer to Section 3.0 of this annual report. <br />Contour Ditch Construction <br />During 2003, Trapper constructed contour ditches in new reclaimed areas of Derringer and <br />Flintlock pits (Map 1). <br />Stock Tank Construction <br />No new Stock Tanks were constructed during the 2003 field season. Refer to Section 6. <br />Stock Tank Reclamation <br />No Stock Tanks were reclaimed during the 2003 field season. Refer to Section 6. <br />Develoomenta! Drill Sites <br />No developmental drill sites were disturbed during 2003 that require reclamation. All 2003 <br />development drill sites will be included within pit advance disturbance by the end of 2004. <br />Topsoil Piles <br />Refer to Section 5. Topsoil stockpiles were sloped and seeded to the approved 2003 <br />perennial topsoil pile mix. Approximately 10.6 acres were treated. <br />Sediment Dams <br />During 2003, no new sediment ponds were constructed. No Name #2 and #4 and East Flume <br />sediment ponds were cleaned. East Pyeatt #1 embankment was raised approximately one <br />foot and the upsiope embankment of East Pyeatt #3 was lined with rock. All embankment <br />disturbance areas were broadcast-seeded with the approved seed mix. <br />NPDES Sites 003, 006 and 010 were removed from monitoring requirements due to Phase II <br />and III bond release. East Buaard #1 and #2 and West Buaard #1 and #2 ponds were <br />reclaimed. West Buuard #3 and Elk #1 ponds will remain as permanent structures in <br />accordance with TR-92. <br />