My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47996
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:59 PM
Creation date
11/20/2007 1:23:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006031
IBM Index Class Name
Permit File
Doc Date
3/13/2007
Doc Name
Decision Ltr- Approval and Bond Calc
From
DRMS
To
Steel Rose, Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinst Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 03/09/2007 <br />User : DEG <br />State :Colorado <br />County :Park <br />Site :Steele Rose 1 <br />PermiVjob# : M-2006-031 <br />Abbreviation ;none <br />Filename ; M031-001 <br />Agency or organization name :ORMS <br />Permit or other job action :New 110(2) Application <br />Task description :8ac~11 and Regrade Overburden <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series II - 8SU (200; Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. t : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership costlhour : $58.24 NA <br />Operating costlhour : $73.75 100 <br />Ripper op.cosUhaur: $3.43 50 <br />Operator cosUhaur : $32.78 NA <br />Total unit cost/hour : $168.20 Total fleet cosUhour : $168.20 <br />,: _. <br />MATERIAL QUANTITIES , <br />Initial Swell Loose <br />volume : 4,167 BCY factor : 1.250 volume : 5,209 LCY <br />Source of estimated volume :Operator Estimate <br />Source of es8mated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correc8on Factors Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 852.6 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 0.00 % (/ <br />Average site altitude : 9,440 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Eadh <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />AlBtude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.43 <br />Adjusted unit production : 368.38 LCY/hr <br />Adjusted Rest production : 388.38 LCY/hr <br />J06 71ME AND COST <br />Fleet size : 1 Dozers) Total job time : 14.14 Hours <br />Unit cast : $0.457 /LCY Total job cost : j$378 <br />
The URL can be used to link to this page
Your browser does not support the video tag.