Laserfiche WebLink
CIRCES Cost Estimation Software <br />Date : 09-Mar-2007 Permit or job no. <br />User : DEG Abbreviation <br />Filename <br />Agency or organization name : DRMS <br />Permit or job action :New 110(2) Permit <br />M-2006-031 <br />none <br />M031-000 <br />Site :Steele Rose 1 <br />State :Colorado <br />County :Park <br />TASK LIST /DIRECT COSTS FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Backfilland Regrade Overburden dozer 1 14.1 $2,378 <br />002 -Replace Topsoil dozer 1 0.8 $143 <br />003 -Revegetate Disturbed Area revege 1 20. $3,247 <br />004 -Mob/Demob mobilize 1 2.9 $818 <br /> suarorALS: 37.97 $6,584 <br />' inUutles inflation factor adjustment of : NA % TOTAL DIRECT COST • - $6,584 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT • Llabilily IOSUranCe : 2,02 % O(dlreCt total = $133 <br />Performance bond : 1.05 % o/direct total = $69 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % o(direct total = $658 <br />• nol required (or eqp. operator serves as super.) TOTAL O & P = $861 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT(direU*08P)= $7,445 <br />Financial warranty processing (legallrelated costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of Intr. NA total = $372 <br />CONTINGENCY - NA' NA total = NA <br />'conangerrcies accounted for at tasklevel TOTAL INDIRECT COST= $1,733 <br /> TOTAL BOND AMOUNT (direct + Indirect) = 58,317 <br />