Laserfiche WebLink
999 I F 4 Surveys, Inc. <br /> MAPPING-PLANNING-SURVEYING <br /> P.O. BOX 290 • MESA, CO 81643 • (970)268-5851 • FAX:(970)268-5532 <br /> February6, 1997 DES~`'" <br /> OFFICE <br /> Mr. Wallace H. Erickson Received <br /> Division of Minerals and Geology <br /> Department of Natural Resources <br /> 484 Turner Drive FEB 10 1937 <br /> Building F, Suite 101 <br /> Durango, CO 81301 Dura^^o Field 0"IN <br /> RE: Western Slope Flagstone Quarry No. 2 Divicbn cf Mnera!s 3 Geology <br /> Permit No. M-96-076 <br /> Dear Mr. Erickson: <br /> Please find enclosed exhibits addressing the "Adequacy Issues" listed in your letters of January <br /> 23, 1997 and January 27, 1997. <br /> It appears that our copy of"Mineral Rules and Regulations" last amended 9/91 has been <br /> replaced. Please send us two current copies of"Construction Material Rules and Regulations of <br /> the Colorado Mined Land Reclamation Board", effective 1/96. <br /> Enclosed is our check No. 5606 for$16.00. <br /> ADEQUACY ISSUES <br /> Public Notice - Enclosed are two notarized "Proof of Publications"; one for September 13, 1996 <br /> and another for December 17, 1996. <br /> These notices were hand delivered to Mr. Robert Orr, managing partner for Powder Mountain <br /> Ranch. Powder Mountain Ranch is the only owner of surface rights within 200 feet of the <br /> boundary of the affected lands. Powder Mountain Ranch also owns the Martin Crawford Ditch <br /> identified under Exhibit L. Mr. Robert Orr confirmed by his written note that Powder Mountain <br /> Ranch has "no problem with this and the Martin Crawford Ditch" verified by his signature dated <br /> January 30, 1997. <br /> Exhibit C - Mining Plan - No improvements were planned or are necessary to the pre-existing <br /> haul road, for it has previously been supporting the removal of construction materials by SEM <br /> Construction since 1986. However, due to the concern by Ute Water that "heavily loaded truck <br /> traffic" may require additional protection of it's water mains, additional road base, as discussed <br /> with Ute Water, will be placed at the three (3) water main crossings identified on the enclosed <br /> exhibit for Haul Road Crossings of Ute Water Pipeline. <br />