Laserfiche WebLink
Stipulation No. 4 Con't <br />Dnor to construRlUn of the cnmpaclcd rlay bner, <br />the aDpl't'ant shall submll n rcvomn to the <br />permit with detailed Inforrnatlon on constructbn <br />pf the compacted clay Irner and wbmd a quality <br />con7ol and assurance Dlan for the Dlvrs~on's <br />review and approval, A copy o(the reNslen <br />shall be /orwardeA to Ne Colorado Department <br />of Transportation (COpT I when subm~tteo to the <br />Orwsron of Mmerats and Gmlogy~ <br />Stipulation No. S <br />inc dppllcant will construct pcnme[cr beans, a5 <br />mown cn tnc m~n,nq and reclamation plans, at the <br />beylrmmq e! cant respective m~nmq phase. Thc <br />Lu~rnts seal De seeded with the speufled seed mlz In <br />the tall dr (he sprlm~ h1C dFPllcant ghall install <br />~m~yabon, trees and shnrDS as soon as R ~s feasible <br />eRer the berms have been constructed. Planuny for <br />decldueus trees shall occur pnor to Cktebcr 16" and <br />after Merch IS"' Plantlnq for evergreen V ces shall <br />occur odor to Dctdttdr I° and aher Mardt LS"~ <br />No. 4 Con't <br />• the apPUCdnt snap submit and obtmn approval <br />from the UrVI51on u! [onsirpcbpn rppOrt.5 on Cidy- <br />fined slopes that have Dern completed In order <br />to urinate. the nest 6.000 Ilnca( lest of mlNnq. <br />• Final release of the clay Irner must be oDtalned <br />from the OMCC of !hr. State Engineer m order for <br />tnC Dwlston [o release any remam~nq <br />rcclamatron pond. <br />Stipulation No. 6 <br />