Laserfiche WebLink
i <br />r-2m <br />~- <br />ulation No. 1 <br />DMG Recommendaton <br />^ SW TKO Joni[ Venture has me[ the <br />minimum requirements of the Act <br />and the Construction Materials Rules <br />and RcyulaUOns. <br />^ DMG recommends approval with <br />stipulations. <br />Stipulation No. 2 <br />Prior to discharge of mrne water mto <br />existing ditches, the applicant will <br />obtain approval from the Division of <br />Minerals and Geology for a ditch <br />5[abllizaUOn and erosion control plan in <br />Utc form of a rewslon to the permit. <br />Stipulation No. 3 <br />Prior to discharge. to the west through the <br />two concrete box culverts or other culverts <br />under US Hwy 85 owned and opereted by <br />CDOT, the applicant will demonstrate that <br />thr. adverts can handle the flows from any <br />lawlul use by the applicant and that US Hwy <br />AS wdl not be negatively impacird. Thr. <br />applicant nowt obrnm written (onsant from <br />CDOT •~- .I ~. ~~mi, ~, mme water mto the <br />ndvor ~I~r U~; il~ry 85 poor is discharge <br />into II~_.~ ,~~ t, <br />Stipulation No. 4 <br />In order to malnta~n phased bonding for the tlay <br />uneq the fo~lowmq perma cordalonz must be <br />ragowcd; <br />• The app4can[ shall not mmc Portd 7 below the <br />groundwater [able unni Pcnd t ~s redauned to two <br />Feet above the greundwa[er tevcl, <br />• me app~lrant must begin [pn5tryttlon of the 510pa <br />liner no Inter than aRer two ph35C5 have bCln <br />(pmp:Cteiy mlrcd Ip bedrock. <br />• The maximum Lncar /eet of scope that may be <br />disturbed and not recla~mcA at ring ywen time shall <br />be no greater than 6,000 In+eal rcet <br />