Laserfiche WebLink
d. Type of seaming, patching, and tacking equipment. <br />e. A copy of the MANLtFACTURER's and/or Fabricator's approval letter(s) <br />and/or license(s), if applicable. <br />B. CONTRACTOR shall provide the following information after contract awazd but within ten <br />(10) days prior to geomembrane arrival on-site and prior to commencement of the Work: <br />1. A copy of each of the Quality Control Certificates on each lot of resin issued by the <br />resin Supplier for the specific material for this project including certification of the resin <br />for extrusion welding. <br />2. The results of Quality Control testing conducted by the MANUFACTURER on the <br />resin used in manufacturing the specific material for this project. <br />3. A listing that correlates the resin to the individual geomembrane rolls and welding rods. <br />4. A copy of the geomembrane roll Quality Control Certificates. These certificates shall <br />be supplied at a minimum frequency of one (1) per every fifty thousand (50,000) square <br />feet of geomembrane material produced. These certificates shall be issued only for the <br />individual geomembrane rolls sampled and tested by the MANUFACTURER or its <br />representative. The certificates will contain test results of properties outlined in <br />Article 2.01 of this Section. MANAGER reserves [he right to refuse use of any <br />geomembrane supplied without the proper quality control documentation at no cost to <br />CC& V. <br />5. A detailed list of performance criteria for the geomembrane material being produced for <br />[his project. (Note: Performance criteria are sometimes referred to as "minimum <br />• property values". Refer to Articles 2.01 and 2.02 of this Section for geomembrane <br />properties and Test Methods.) <br />6. Resume from the INSTALLER of the Installation Superintendent, Master Seamer, and <br />Quality Control Inspector to be assigned to the work, including dates and duration of <br />employment. <br />7. Certification from [he INSTALLER that both the Installation Supervisor, Quality <br />Control Inspector, and Master Seamer have reviewed the SPECIFICATIONS, <br />Construction Quality Assurance Plan, and the DRAWINGS. <br />8. A panel layout drawing showing the proposed installation layout identifying field seams <br />and including areas such as sumps, trenches and pipe penetrations as well as any <br />variance or additional details that deviate from the DRAWINGS. The layout shall be <br />adequate for use as a construction plan and shall include dimensions, details, etc. Any <br />proposed variance or deviation from these documents shall be submitted to <br />MANAGER in writing a minimum of seven (7) Working days prior to the scheduled <br />start of geomembrane installation and will be accepted/rejected by CERTIFYING <br />ENGINEER prior to start of installation. <br />9. A list of personnel performing field seaming operations along with pertinent experience <br />information. <br />10. All geosynthe[ic Quality Control Certificates requued by these SPECffICATIONS. <br />11. Certification that extrudate to be used is comprised of the same resin as the <br />geomembrane to be used. <br />Section 02776 Page 2 of 20 October 25, 2000 <br />Geomembrane Golder Associates Revision 8 <br />