Laserfiche WebLink
SECTION 01400.1 EARTHWORKS CONSTRUCTION QUALITY ASSURANCE tCOAI PLAN <br />u <br />PART 1: INTRODUCTION <br />This plan addresses the construction quality assurance (CQA) procedures for the installation of the <br />earthworks (soils) components of the valley leach facility at the Cresson Project, Teller County, Colorado. <br />This program has been developed to assure that the constmction of the soil components aze in compliance <br />with the project SPECIFICATIONS and to demonstrate that the regulatory requirements for the <br />construction are achieved. <br />The objective of this plan is to assure that proper materials, construction techniques, and procedures are <br />followed by the CONTRACTOR and that the intent of the design is met. This plan also provides the <br />means for resolution of problems that may occur during construction. <br />This plan addresses quality assurance, not quality control. This CQA Plan is independent of the quality <br />control (QC) programs conducted by CONTRACTOR. The intent of the CQA Plan is to provide <br />independent third patty verification and testing, to demonstrate that the CONTRACTOR has met its <br />obligations in the supply and installation of earthwork (soils) materials according to the design, project <br />SPECIFICATIONS, contractual, and regulatory requirements. Quality control is provided by <br />CONTRACTOR and refers to those actions taken by the CONTRACTOR to ensure that materials and <br />workmanship meet the requirements of the DRAWINGS and SPECIFICATIONS. <br />PART 2.0 DESCRIPTION OF PARTIES TO CONSTRUCTION QUALITY ASSURANCE <br />The following section provides descriptions of the parties to this CQA Plan including their responsibilities <br />and qualifications. <br /> <br />2.01 CC&V: <br />In this CQA Plan, CC&V refers specifically to Cripple Creek & Victor Gold Mining Company. CC&V <br />owns and operates the valley leach facility. <br />2.02 MANAGER: <br />Tn this CQA Plan, MANAGER refers to the individual appointed by [he Cripple Creek & Victor Gold <br />Mining Company. MANAGER is [he official representative of CC&V and is responsible for all <br />construction activities including oversight and direction during construarion. MANAGER is also <br />responsible for coordinating construction and CQA activities for the project. <br />MANAGER shall serve as communications coordinator for the project, initiating preconstrudion and <br />resolution meetings. As communications coordinator, MANAGER will serve as a liaison between all <br />parties involved in the project to ensure that ongoing communications aze maintained. MANAGER and <br />CERTIFYING ENGINEER shall be responsible for the resolution of all CQA issues. <br />Duties for this position include the following: <br />- review and approval of DRAWINGS and SPECIFICATIONS for alt soil components of <br />the valley leach facility; <br />- preconstmction coordination with the CQA Monitor to ensure that the CQA Monitor has <br />performed similar reviews of the DRAWINGS and SPECIFICATIONS to ensure that the <br />CQA Plan can be implemented; <br />- coordination of all construction activities associated with CONTRACTOR; <br />Section OI400.1 Page ] of 10 <br />Earthworks CQA Plan Golder Associates <br />1100\2203\0400\CERI'REP0602UPPENDS~APPt1014001R5 DOC <br />March 22, 2000 <br />Revision 5 <br />