Laserfiche WebLink
u <br />3. Provide continuous northing, easting, and elevation reference for field testing and <br />sampling location identification. <br />4. Provide depth verification for he Low Volume Solution Collection Fill on a 50-foot <br />by 50-foot grid with additional points at all grade breaks. <br />5. Provide depth verification for Drain Cover Fill on a 50-foot by 50-foot grid with <br />additional survey points at all breaks in grade. <br />6. Provide northing, eesting and elevation reference for any underground working <br />confirmatory drillhole and blasthole locations. <br />Northings, eastings, and elevations for Items ], 2, 3 and 6 will be performed on a daily basis and <br />results will be provided to the MANAGER in both electronic and hazdcopy format within 24 <br />hours of performirtg the survey. <br />*** END OF SECTION *** <br /> <br />Section 01050 Page 3 of 3 <br />Construction Staking Golder Associates <br />L\001220T04001CERTREP0502WPPENDSW PPE\01050R3.000 <br />March 22, 2000 <br />Revision 3 <br />