Laserfiche WebLink
3.04 BLASTING <br /> <br />The CONTRACTOR shall compact the surface of the area that has been blasted. If the blasted surface is <br />below the Soil Liner subgrade elevation, the CONTRACTOR shall compact the blasted surface using a <br />method specification approved by the CERTIFYING ENGINEER, and then remediate according [o the <br />DRAWINGS to achieve the design grades and elevations. If the blasted surface is above the Soil Liner <br />subgrade elevation, the CERTIFYING ENGINEER assess the foundation conditions and recommend <br />whether the CONTRACTOR shall overexcavate and backfill with Cemented Rockfill and Structural Fill, <br />or if the CONTRACTOR shall remove excess material and compact the final grade surface using a <br />method specification approved by the CERTIFYING ENGINEER. <br />*** END OF SECTION *** <br />r~ <br />L_J <br />Section 02210 Page 3 of 3 <br />Underground Working Remediation Golder Associates <br />I:~DQ~2203b9 WICERTRRPo8031MPENDSW PPEA3210RI.DOC <br />Mazch 22, 2000 <br />Revision 1 <br />