Laserfiche WebLink
<br />proceed behind mining as closely as possible there may be times when <br />• 10 to 30 acres are used in mining itself. All efforts will be made to <br />limit this area as much as possible but variations in demand requirements <br />for particular types of limestone may force some partially mined-out <br />areas to remain open for several years at a time. No reclamation can <br />be done until an area is mined out. <br />• <br />C <br />P-D-6 <br />