My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47808
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:49 PM
Creation date
11/20/2007 1:18:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003037
IBM Index Class Name
Permit File
Doc Date
10/1/2003
Doc Name
Preliminary Bond Calculations
From
DMG-grm
To
Banks and Gesso
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # : O6a <br />Date : 10/01/2003 <br />User : GRM <br />State :Colorado <br />County :Montrose <br />Site : Haldorson S & G Mine <br />Permitfjob# : M-2003-037 <br />Abbreviation :none <br />Filename : M037-06a <br />Agency or organization name : DMG <br />Permit or other job action :final reclamation costs estimate -initial <br />Task description :push topsoil over 7.5 acres of slc <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />Basic machine :Cat D8R Series 11 - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank dpper <br /> Utilization <br />Ownership cosUhour : $49.85 NA <br />Operating cosUhour : $66.44 100 <br />Ripper op.cost/hour : $1,76 25 <br />Operator cosUhour : $31.83 NA <br />Total unit wsUhour : $149.88 Total Fleet cosVhour <br />volume : 12,100 LCY <br />$149.88 <br />Swell Loose <br />factor: NA volume: 12,100 LCY <br />Source of estimated volume :7.5 acres of slope X43560/27 <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 30.00 % (i <br />Average site altitude : 5,800 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Top Soil <br />JOB 71ME AND COS7 <br />Fleet size : 1 Dozers) <br />Unit cost : $0.085 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.80 <br />Altitude : 1.00 <br />Material weight : 1.44 <br />Blade type : 1.00 <br />Net correction : 1.26 <br />Adjusted unit production : 1764.70 LCY/hr <br />Adjusted fleet production : 1,764.70 LCY/hr <br /> <br />Total job time : 6.86 Hours <br />Total job cost : $1,028 <br />Horsepower: 310 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.