Laserfiche WebLink
CIRCES Cost Estimating Software <br />Permit or otherjob action :final reclamation costs estimate -initial <br />Task description :replace topsoil over 47 acres of pit floor <br />Model :Cat 633E Series 2 <br />Shift basis : 1 per day <br />Cost Breaktlown : Job util'IZation °h Horsepower : 490 <br />Ownership cosUhour ; $67.49 NA Weight (UST) : 56.34 <br />Operating cost/hour : $107.58 100 Cost data source : (CRG) <br />Operator cosUhour. $25.43 NA <br />Total and cosUhour ; $200.51 Total fleet cosVhour : $802.02 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: - 75,827 LCY factor . NA volume: 75,827 LCY <br />Source of quantity take-off :47 acres X 43560/27 <br />Source of estimated swell factor:NA <br />HOURLY PRODUCTION <br />Haulino Caoacity <br />Basis <br />Matedal weight: 1,600 pounds/LCY <br />Material description <br />Top Soil <br />Rated payload : 82,000 pounds <br />Payload capacity : 51.25 LCY <br />Cvcle Time !load + haul + soread + return) <br />Travel time <br />Scraper Bowl (volume] Basis <br />Struck volume : 23.20 LCY <br />Heaped volume: 34.00 LCY <br />Average volume : 28.60 LCY <br />Adjusted capacity : 28.60 LCY •" <br />Loading time: 0.90 minutes' <br />Maneuver and spreading time : 0.70 minutes <br />loetling time per pair on pustfpull motlela <br />Route ~ Distance (feet) ~ Grade (°/p) ~ Roll. res.(%) ~ Total res.(%) I Velocity (fpm) I Travel time (min.) <br />Haul: 800 2.0 5.0 7.0 977 0.82 minutes" <br />Return: 800 -2.0 5,0 3.0 2,999 0.27 inutes 1e <br />^ Uavel time etljuated far ecceleretion entl tleceleretion et loatl antl tlump poirrcs <br />velocities era max ettairlable per total resi stance atwwn, not avereae <br />Job Condition Correction Factors <br />Site altitude (feet) : 5,800 <br />Altitude adjustment factor : 0.96 (Cat HB) <br />Job efFlciency factor : 0.83 (1 shiWday) <br />correction factor : 0.80 <br />JOB TIME AND COST <br />Fleet size : 4 Suaper(s) <br />Unftwst: $0.394 1LCY <br />Total cycle time : 2.69 minutes <br />Adiusted Hourlv Production <br />Unadjusted unit production : 638.9Y LCY/HOUr"' <br />Adjusted unit production : 509.13 LCY/Hour <br />Adjusted Beef production : 2,036.51 LCY/Hour <br />2 times volume on Duahyull modals <br />Total job time : 37.23 Hours <br />Total job cost : $29,862 <br />Agency or organization name :OMG <br />Task # : 05a State :Colorado Pennitfjob # : M-2003-037 <br />Date : 10/01/2003 County :Montrose Abbreviation :none <br />User : GRM Site :Haldoreon S & G Mine Filename : M037-05a <br />