My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47768
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47768
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:47 PM
Creation date
11/20/2007 1:17:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987113
IBM Index Class Name
Permit File
Doc Date
6/25/1987
Doc Name
APPLICATION FOR A MLR PERMIT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />MINING PLAN (cont) EXHIBIT D <br />i 1 <br />' clays used for making brick. Both the clay and aggregate operations <br />are dependent on demand and will operate intermittently throughout <br />' the year with long inactivity punctuating periods of intense activity. <br />As each stage begins, soils will be removed and stockpiled in <br />' setback and right-of-way areas for later use in re soiling and <br />revegetating the slopes and other areas from which soils have been <br />' removed. Storage will be on the south and west sides of the pit <br />in the sight berms. it should be noted a portion of the berm may <br />' be retained after reclamation is complete. The Department of <br />Energy and Rockwell Security are still studying the possibility of <br />' leaving this berm. Please refer to Map Exhibit D-1 for the typical <br />cross sections of these berms. Stripping ahead of the mining <br />operation will be reduced as much as possible so as to minimize <br />' visual impact. It is not expected that any significant amount of <br />unusable overburden will be encountered. <br />' Mining for sand and gravel will start in Stage 1 on the south <br />end of the east parcel of the affected land and proceed to Stage 2 <br />' then Stage 3 on the eastern parcel. when mining is complete in <br />Stage 3 it will move to Stage 4 on the west parcel and continue <br />' thru stage 7 to completion. <br />The excavation for sand and gravel will be set back 30 feet <br />' from the lease line except where the affected lands adjoin the <br />Church Pit, MLRB Permit NO M-79-45, there will not be any setbacks. <br />The slopes left in the Church Pit will be removed at this time so A <br />' as to blend the floors of the mines and leave one big floor area. ~N <br />The typical cross section on the Reclamation Map (Map Exhibit F) (,u <br />' shows how the floors will blend. This removes the ridge of unmined <br />material running down the adjoining pit boundaries. <br />' As excavation proceeds, the outside perimeter slopes, ie those <br />not adjoining the Church Pit, will be left at 2:1 or will be <br />backfilled to 2:1. The excavation will be setback 30 to 50 feet <br />from the center line of the Church Ditch and 30 to 50 feet from <br />' the center line of the McKay Ditch. Sloping here will be 2:1 just <br />as with the outside perimeters. <br />' 6 <br />