Laserfiche WebLink
.. ~ `~ <br />Court ruling on ttie adequacy of the water supply. Such detennination <br />may require additional information from the applicarrC to demonstrate. <br />compliance.. It ,is understood by this Board that the actual result of <br />the change in .point of diversion being applied for will likely be the <br />dugmentation of flow in the river and no adverse effect on minimum <br />stream flows. This permit is specifically conditioned upon the approval <br />of a change in the point of diversion not reducing the established <br />minimum stream flow. <br />9. Not more than ten (10%).of all gravel excavated from t'he site and <br />hot-mix produced on the site shall be sold for use outside Pitkin <br />County. No discrimination shall be shown to any purchaser within the <br />County, but this provision shall not prevent the Operator from giving <br />quantity discounts. <br />10. The published Pitkin County Sand end Gravel Regulation Ss incorpcrated <br />herein by reference and made a part hereof as if fully set forth herein. <br />11• The Operator may use a 5,000 square foot area, designated on the site <br />plan as camper area for employees to park not more than six (6) recrea- <br />tional vehicles for the exclusive use of parking vehicles for temporaty <br />housing while working in the Aspen area. Use of this area by camper <br />vehicles shall be limited to ttonday through Friday during the months <br />of June, July, August and September or whenever Elam ils operating out <br />of the Vagneur pit site, whichever time period is less. This area <br />Shall be bermed to conceal them from view fran the surrounding area. <br />12. Development and Reclamation. <br />A. The Operator has filed with the County, maps showing the proposed <br />excavation during the five-year period (Exhibit A). In addition, <br />a cross section has been filed with the County (Exhibit A) to <br />illustrate the proposed method of establishing rehabilitation of <br />the disturbed slopes. Reclamation shall be in accord with these <br />cross section drawings. <br />B. Revegetation must be accomplished as soon as practicable after <br />work has. been completed in an area where the Operator has concluded <br />its work. The intent of the provision is that exposed slopes shall <br />be rehabilitated at the earliest possible date <br />At~ the hearing to <br />-5- <br />