<br />
<br />r
<br />!`,
<br />Table 4,9-2-1 coot -page 2
<br />A
<br />N
<br />Q
<br />v
<br />Topsoil Coordinates Size Approximate Created
<br />Pile ID Location North East (acres) CYDS Date
<br />EP2 East Pyeatt Dam #1 East 412,150 1,426,900 0.4 3,700 1985-"
<br />EP3 East Pyeatt Dam #2 West 413,100 1,426,350 0.7 7,500 1988
<br />EP4 East Pyeatt Dam #2 East 413,200 1,426,750 0.4 4,500 1988
<br />FS1 Anfo silo 410,250 1,410,950 0.2 550 1/80
<br />FS2 E fuel storage area pile 405,450 1,418,100 1.8 17,929 12!78
<br />GP-1-93 Grouse Pond 412,925 1,429,530 0.9 13,212 1993
<br />HN-2-93 H pit North #2 412,720 1,422,940 3.3 95,688 1993
<br />HR1 D haul road east (prestrtp to E pit) 402,400 1,416,500 2.5 6,700 12178
<br />HR2 D haul road west 402,800 1,416,650 1.9 10,900 12178
<br /> (prestrtp to ramp #2)
<br />HR3 E haul road runaway site 404,550 1,417,900 0.5 3,779 pre 12/77
<br />HR4 D haul road anfo site to S curve 404,400 1,417,450 1.6 10,621 pre 12!77
<br />HW-1-93 H pit West #1 411,540 1,422,060 4.7 178,308 1993
<br />JG1 Johnson Gulch Dam #7A 411,700 1,419,700 1.6 25,116 6180
<br />JG2 Johnson Gulch Dam if8 412,500 1,420,150 1.2 15,458 1/86
<br />JG3 Johnson Gulch Dam #9 413,100 1,420,300 1.4 14,269 1986
<br />JG4 Johnson Gulch Dam #10 414,250 1,419,950 1.8 25,777 1987
<br />JGS Johnson Gulch Eled Station 414,250 1,419,450 D.5 6,209 1989
<br />JG8 North A Haul Road Johnson 413,000 1,420,950 1.3 13,212 1987
<br />JG7 North A Haul Road Ag Field W 412,400 1,422,250 0.6 16,850 1988
<br />JG8 North A Haul Road Ag Field E 412,300 1,422,700 0.8 12,840 1988
<br />LG1 Low grade coal topsoil pile 406,800 1,418,500 2.6 105,748 6/85
<br />MA92-1 Middle Pyeatt Regrade Spoils 409,800 1,426,000 6.0 179,676 1992
<br />MD92-1 D Pit Middle 403,600 1,418,600 2.3 40,508 1992
<br />ME-5-93 Middle E pit#5 403,955 1,419,950 0.8 5,888 1993
<br />MH1 Main haul road north 411,650 1,418,650 1.1 27,334 1/86
<br />MH2 Main haul road south 410,800 1,418,550 1.3 35,216 12182
<br />MP7 Middle Pyeatt Dam #1 412,200 1,425,030 0.6 4,200 1986
<br />MP2 Middle Pyeatt Dam #2 413,000 1,425,220 1.3 12,500 1988
<br />MP3 North A Haul Road Study Plot 411,200 1,424,650 9.5 127,238 1988
<br />MP7 Middle Pyeatt Sediment Basin 411,000 1,425,350 0.2 845 1991
<br />7J95
<br />
|