DRAFT <br />_ Materials not meeting the specified moisture content and dry density requirements, as determined by <br />the tests, shall be reworked until approved results are obtained. Reworking may include removal, <br />rehandling, reconditioning, rerolling or combinations of these procedures. The Contractor shall be <br />entitled to no additional allowance above the prices of [he work required to achieve the placement <br />moisture content and density specified in this section. <br />The moisture content of the earthfill material prior to and during compaction shall be distributed <br />uniformly throughout each layer of the material. As far as practicable, the materials shall be brought <br />to the proper moisture content by adding supplementary water, if required, to the material by <br />sprinkling on the earthfill and each layer of earthfill shall be conditioned so that the moisture is <br />uniform throughout the layer. <br />Density control of compacted earthfill shall be such that the dry density of the compacted material, as <br />determined by tests performed by the Engineer, shall conform to not less than 90% of its Proctor <br />maximum dry density. Material which does not meet these requirements will be rejected and shall be <br />reworked until a dry density equal [o or greater than these requirements is reached. <br />3.06 PLACING AND COMPACTING <br />A. Compacted Fill <br />The material shall be placed in areas shown on the Plans in continuous and approximately horizontal <br />layers, not more than 12- inch loose lifts. The combined excavation and placing operations shall be <br />such that [he materials will be sufficiently blended [o secure the best practicable degree of compaction <br />and stability. <br />The material shall be compacted to 90% of the Standard Proctor as described in ASTM D-698. The <br />method of compaction shall be submitted to the Engineer for approval. <br />END OF SECTION <br />