Laserfiche WebLink
92 <br />• <br />'Ilse total topsoil available for Nucla Mine is: <br />127.3 acre-feet (Tab 9, Attachment 1, Section 3) <br />+ 8.0 acre-feet (Salvageable shop area soils) <br />135.3 acre-feet (Total) <br />Thus, the anticipated topsoil replacarwnt depth for Nucla Mine should <br />be revised to approximately: <br />135.3 ac-se-feet = 1.0 feet <br />130.5 acres <br />ODNQ,USION <br />Similar types of mining disturbance will occur in the shop area as <br />do in the West Pit Ares. Prior to disturbance, about twenty (20) <br />inches of topsoil will be salvaged from the Shawano soil type to <br />• be redistributed on regraded reclamation areas or temporarily stared <br />in topsoil stockpiles. Approximately twelve (12) inches of topsoil <br />will be replaced after the area is graded to final contour. <br />• <br />