Laserfiche WebLink
<br />EXHIBIT - C Mining Plan <br />1. Mining will commence upon receiving 110 permit, Life of mine will <br />depend upon demand. Most of the material is used in the precast industry, <br />Mining should be in the 5,000 - 10,000 ton per year range. <br />2, Topsoil is minimal over most of the deposit. In our processing we <br />can have no topsoil, therefore any encountered will be stockpiled to go <br />back on pit slopes upon depletion of ore. <br />3. Overburden and waste will also be minimal in this pit. What little <br />is encountered will be utilized in constructing stockpile pads. <br />4. Prior exploration drilling indicated Obsidian vein to be approxi- <br />mately 100 Peet thick. As it is exposed on the surface we will mine into <br />it to develop a 40' face and maintain that level. <br />5. All areas are listed on map. <br />6. Pit # 1 will be approximately 200' x 300' long. Pit # 2 will be <br />approximately 100' wide by 200' long. <br />7. Existing access road is 20' ± wide which is sufficient for our needs. <br />There will be no improvements. <br />8. There will be no water used in mining operations. <br />9. Most likely no ground or surface water will be encountered. As this <br />is an existing pit there are no indications. If so they will be contained in <br />the existing dike shown on lower part of map. <br />10. No water rights will be interfered with. <br />11. Our plant facilities are located in Canon City, CO. At this time <br />all processing is done there, If needed in the future a portable crusher <br />can be set up on site, but would be for short periods of time. Basically <br />the mining would be accomplished by driblasting, loading and hauling. <br />There will be no chemicals used. <br />Page 5 <br />