Laserfiche WebLink
RECLAMATION COST SUMMARY con['d <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description <br />NA ~ No portals or shafts created <br />L. DRILL HOLE/MONITORING HELL SEALING <br />Task No.l Task Description <br />sheet 4 of 4 <br />Cost (E) <br />_________________________ <br />Subtotal (K): <br />Cost (E) <br />NA ~ No drill holes or monitoring wells created <br />Subtotal (L): <br />------------ <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (E) <br />6 ~ Demolition Per attached task 6 worksheet ~ E252 <br />4 ~ Seeding Per attached task 4 worksheet ~ E6, 705 <br />NA ~ Fencing Fencing no[ required e[ [his time. <br />5 ~ Mob/Demob Per attached task 5 worksheet ~ E1, 084 <br />_____________________________________________________________ <br />Subtotal (M ): ___________ <br />E8, 041 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): E15,677 <br />II. INDIRECT COSTS <br />_____________________________________________________________ <br />___________ <br />_____________________________________________________________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT ___________ <br />Item No. Item Description ~ <br />__________________________________________________________I_ Cost (E) <br />___________ <br />1. ~ PubLic Liability Insurance.... 1.SSOX of dir. ~ E243 <br />2. ~ Lon[rac [or's Performance Bond 1.SSOX of dir. ~ E243 <br />3. ~ Contractor's Profit........... 10.OOX of dir. ~ E1,568 <br />4. ~ Job Superintendent.. equip op serves as super <br />Subtotal (A ): 52,054 <br />- <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 6 P): ----------- <br />E17, 731 <br />B. DMG PROJECT ADMINISTRATION E%PENSES <br />Item No.l Item Description <br />________I___________________________________________________ Lost (E) <br />___________ <br />1. ~ Minerals Program Adm 5.00% of cntr.~ <br />_____________________________________________________________ E887 <br />___________ <br />NET INDIRECT COST PERCENTAGE: 18.76% Subtotal (B ): 5887 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): E2, 940 <br />_ <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): ___________ <br />E18, 618 <br />