Laserfiche WebLink
<br /> <br />RECLAMATION COS7 SUMMARY cont'd sheet 3 of 4 <br />H. EARTHNORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (S) <br />________I____________________________________.._____________I__________ <br />NA ~ Stream channel reconstruction not regired until <br />operations advance to later phases. <br />Subto[aL (H): <br />____________ <br />I. EARTHYORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (E) <br />NA ~ Drainage control provided under task 1, 2 <br />Subtotal (I): <br />J. EARTHNORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (E) <br />3 ~ Replace topsoil, 8" depth, for pit and processing 52,854 <br />areas. Approximately 8.5 acres. <br />(8.5 ac)(43560 sf/ac)(0.667'D )/27 = 9747 cy <br />Subtotal (J ): E2,854 <br />