Laserfiche WebLink
<br /> COLORADO DIVIS ION OF MINERALS AND GEOLOGY <br />SCRAPER COST 8 PROOUCTfON DATA NORKSNEET Sheet 1 of 2 sheets REFERENCES: 1) COST REFE RENCE GUIDE <br />--------------"--^-"--- -------------- 2) CONTRACTORS EOUIPMENi COST GUIDE <br />REVISION DATE: April, 1997 3) COLORADO CONTRACTORS ASSOCIATION=d. <br /> -~---------------- PAGE RATE SCHEDULE <br />VORKSHEEi FILENAME: 623E-ROP.YK1 4) CATERPILLAR PERFORMANCE HANDBOOK <br />MACHINE DESCRIPTION: CAT 623E ELEVATING <br />__________________ SCRAPER NITH <br />______________ ROPS CAB <br />_____________ <br />______ <br />____ <br />COST ADJUSTMENT FACTORS BASE VALUE ADJUSTED VALUE <br />Acquisition Cost: 5424,200.00 5310,086.81 <br />Economic Life Hours: 13420 12000 <br />ROPS Cab Econ. life Hrs: 12250 N/A <br />Annual Use Hours: 2112 1450 <br />Mech. Labor Cost-Zone 1: 527.15 427.15 <br />-Zone 2: 527.15 527.15 <br />Fuel Cost per gal.: 51.07 51.07 <br />Cube Cost: ~ 54.16 54.16 <br />Tire Life Hours: ~ 2700 2600 <br />Tire Purchase Price: 528,485.00 522,906.80 <br /> --- BASE OYNE RSNIP 8 OVERH AUL COSTS ----~ -------- ------- -BASE OPERATING COSTS -- -------- <br />BASIC MODEL 8 ATTACHMENTS <br />__________________________ DESCRIPTION <br />___________________ I DEPRECIATION <br />______________ OHD/CFL <br />_____________ LABOR <br />_______ PARTSI <br />________ LABOR <br />_ ______ PARTS <br />_______ FUEL <br />__________ LURE TIRES <br />______________ G.E.L. <br />___ ____ <br />Xachine Hodel No. CAT 623E Y/ROPE 515.45 514.96 54.63 518.65 57.20 514.35 514.84 54.16 510.55 51.02 <br />Attachment tl1 N/A 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 <br />Attachment ii2 N/A 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 <br />Attachment C3 N/A 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 <br />BASE COST SUBTOTALS f15.45 514.96 54.63 518.65 57.20 514.35 514.84 54.16 510.55 51.02 <br /> ~-- ADJUSTED 017NERSHIP 8 OVERHAUL COETE -~ -------- --- ADJUSTED OPERATING COSTS -- -------- <br />COST ADJUSTMENT FACTORS FACTOR VALUE ~ DEPRECIATION OHD/CFC LABOR PARTS LABOR PARTS FUEL LOBE TIRES G.E.C. <br />Acquisition Cost 0.7310 511.29 N/A N/A N/A N/A N/A N/A N/A N/R N/A <br />Economic Life 1.1183 512.63 N/A 55.18 520.86 58.05 516.05 N/A N/A N/A N/A <br />Annual Usage 1.4566 516.45 521.79 N/A N/A N/A N/A N/A N/A N/A N/A <br />Double shifts .750depr.-.SOOohd 512.34 510.90 N/A N/A N/A N/A N/A N/A N/A N/A <br />Triple Shifts .667depr.-.333ohd 510.97 57.26 N/A N/A N/A N/A N/A N/A N/A N/A <br />Mechanic Cost - Zone 1 1.0000 N/A N/A 55.18 N/A 58.05 N/A N/A N/A N/A N/A <br />- Zone 2 1.0000 N/A N/A 55.18 N/A 58.05 N/A N/A N/A N/A N/A <br />Fuel/Cube/Tire Cost Variable N/A N/A N/A N/A N/A N/A 514.84 54.16 58.81 51.02 <br />Scraper Util. - Zane 1 100.00% N/A N/A 55.18 420.86 58.05 516.05 514.84 54.16 58.81 51.02 <br />- Zone 2 100.OOY. N/A N/A 55.18 520.86 58.05 516.05 514.84 54.16 58.81 51.02 <br />0.D JUSTED COST SUBTOTALS -S .SHIFT -ZONE T: 516.45 521. 79 55 .18 520 .86 58. 05 516. 05 514 .84 54.16 58. 81 51 .02 <br /> -ZONE 2: 516. 45 521. 79 55 .18 520 .86 58. 05 ~E16. 05 514 .84 54.16 58. 81 51 .02 <br />-D .SHIFiS-ZONE 1: 512. 34 510. 90 55 .18 520 .86 58. 05 516. 05 514 .84 54.16 58. 81 57 .02 <br /> -ZONE 2: 512. 34 510. 90 55 .18 520 .86 58. 05 516. 05 514 .84 54.16 58. 81 51 .02 <br />'T .$HIFTS-ZONE 1: 510. 97 57. 26 55 .18 520 .86 58. 05 516. 05 514 :84 54.16 58. 81 51 .02 <br /> -ZONE 2: 510. 97 57. 26 55. 18 520 .86 58. 05 516. 05 514. 84 54.16 58. 81 51 .02 <br />