Laserfiche WebLink
<br />Colorado Division of Minerals and Geology sheet 1 of 2 <br />ESTIMATING FORM - EQUIPMENT MOBI LI2ATION / DEM08ILI ZATION <br />_________________________________________________________ <br />_________________________________________________________ <br />Task #... 5 Prep. by NHE Filename..M089-5 <br />Date..... 13-OCt-98 Permit # M-97-089 Mine......5[one Gravel Pit <br />Permit Action........ General 112c bond recalculation <br />Task Description..... Haul reclamation equipment to and from job site <br />HOURLY EQUIPMENT COST <br />_____________________ NOTE - This is a list to select from, not a list of manda tory items to inc lude. <br />Mob/Demob Eqp. -Tractor 6x4, 75,000 lb GW, 375 HP, diesel powered <br />-Lt. Trailer 25 ton folding gooseneck, drop deck <br />-Med. Trailer 50 ton folding gooseneck, drop deck <br />-Hvy. Trailer 120 Ton folding gooseneck, drop deck <br />-Pilot Car On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline powered <br />-Hyd. Crane : Grove RT58E rough terrain hydraulic crane, 20 ton capacity, 125 hp, 70 ft. boom <br />-Fuel Truck 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br />-Cube Truck 6x4, 2,500 gallon capacity, 210 NP, diesel powered <br />-Flatbed Truck: 30,000 lb GVN, 210 HP, diesel powered <br />Last Update: ---"-------------------------------------- ---------^_---- ----------------- ----------' <br />August, 1997 (trucks) <br />----------^---------- Lt. Rig Med.Rig Hvy.Rig Pilot Hydraulic Fuel Lube Fla[bed <br />Cost Breakdown: <=25 T. 26.50 T. > 50 T. Car Crane Truck Truck Truck <br />_______________________________ <br />Ownership Cost/hr = 525.59 __________________________________________ <br />528.10 531.38 51.73 524.12 _________^_____ <br />fb.88 __________________ <br />512.66 __________ <br />57.88 <br />Operating Cost/hr = f28.38 530.17 532.34 54.82 531.48 519.57 525.56 511.82 <br />Operator Cost/hr = 522.61 522.61 522.61 521.82 523.13 522.35 521.24 522.35 <br />Helper Cost/hr = 521.82 521.82 521.82 50.00 50.00 So.oD 50.00 50.00 <br />Total = 598.40 5102.70 5108.15 528.37 578.73 548.80 559.46 542.05 <br />NON-ROADABLE EQUIPMENT: <br />----------^----------- Neight Ownership Haul Rig Fleet S ize Haul Trip Return Trip DOT Permit <br />Machine Description (tons) Cost/hr Cost/hr (no. hau led) Lost/hr Lost/hr Cost/ea <br />CAT D8N SU-Blade 34.50 542.12 5102.70 1 5144.82 5102.70 <br />CAT 623E Scraper 37.15 538.05 5102.70 1 5140.75 5102.70 <br />Revegetati on Equipment 10.00 510.00 598.40 1 5108.40 596.40 <br />_____=====a_______________________^_________________________________________________________________________________ <br />Subtotals 5393.97 8303.80 50.00 <br />